NEW - download 'Seoul VillageS (서울 마을들)', my collection of 12 short fictions now adapted into short films! Get your free copy of the ebook (4 editions: English, French, Korean, Bilingual English-Korean)!

Showing posts with label Wirye. Show all posts
Showing posts with label Wirye. Show all posts

Sunday, December 26, 2021

7 Seoul subway / railway updates

MK published yesterday an interesting article* on the impact of 7 recent or upcoming subway / railway developments on real estate, which allows us to see of these old friends have fared since their announcements**.

The Maeil Kyeongje's 7 projects (NB our focus below doesn't follow these numbers)

 . Line 1 extension Northwards from Soyosan Station (3 new stations - Choseong-ri, Jeongok, and Yeoncheon): 

Since this extension mostly doubles an existing train, the article logically mentions a low impact on real estate. but it does make commuting more seamless for densely inhabited parts of Yeoncheon-gun, and allows Seoulites to venture further up the Dongducheon valley (not necessarily closer to the DMZ, though: it follows the same axis in this area).

 . Line 4 extension Eastwards from Danggogae Station (3 new stations - Byeollae Byeolgaram, Onam, and Jinjeop):

To be inaugurated next March, this 14.9 km extension is a game changer for this section of Namyangju dotted with major new towns (Byeollae and Jinjeop-eup). But as usual, what a shame that such major clusters were not connected to the grid from day one. 

Of course, this means more commuter traffic for a line already supporting older generation bed towns, but it will also help one of them, Nowon, grow as a cultural hub in Northeast Seoul. Furthermore, the article reminds us of two other projects that will help cope with the flow:

  • Seoul considers doubling Line 4 with an express service for the 31.7 km section within city limits, between Danggogae and Namtaeryeong, with potentially 12 more stations concerned (all the ones connected to other lines). That would leave 12 stations with only the standard service, along with the ones in Gyeonggi-do.
  • The extension of Line 8 Northwards from Amsa Station to Byeollae Station (Gyeongchun Line) by the end of 2023 could later be prolonged to Byeollae Byeolgaram Station via a new station, Byeollae Jungang, further anchoring Byeollae to the South, and making it a transport hub east of Seoul around a decent 'Byeollae Line' backbone.

 . Inauguration of Namwirye Station (Line 8):

Located between Bokjeong and Sanseong Stations in Seongnam, Namwirye doesn't really support Wirye New Town which, as the author mentions, would have much more impact. But he's not taking into account a tramway bound to deliver the goods: the construction of the Wirye Line is just starting these days.

'#Seoul about to start the construction of its first #tramway in decades (#WiryeLine - 12 stations, 5.4 km - to open i 2025). Line announced 8 years ago (http://seoulvillage.blogspot.com/2013/08/seoul-lrt-projects-update-part-22.html) #transports' (20211220 - @theseoulvillage)


 . Gyeongui Jungang Line extension Northeastwards from Imjingang Station to Dorasan Station

In this part of Paju, as the article confirms, 'nothing to do with real estate'. This line is simply inching further towards Kaesong, now a reasonable walk away... provided of course you've got all the papers to enter the DMZ at that most strategic point. For the moment, you're mostly connecting Seoul to a giant, empty parking lot: doesn't look like many workers will commute any time soon to the Kaesong Industrial Complex... Let's hope that some day, this dead end will be prolonged into a friendlier North Korea.


 . Seohae Line extension Northwards from Sosa Station to Wonjong Station (via Bucheon Stadium Station)

As we've already seen (in "Twice upon a time in the West"), there's a lot going on around Bucheon. This vertical will split much earlier the traffic to/from Seoul between the North (Line 1) and the South (Line 7). And it will later be prolonged not only to Gimpo Airport, but also across the river, to Line 3 (Daegok Station, after a stop in Neunggok Station).

If Daegok seems a bit isolated between Goyang's 'old and new' New Towns (Ilsan to the West, Hwajeong to the East), Line 3 leads to more glamorous sites: downtown Seoul and Gangnam. And I wouldn't be surprised to see this new, vertical airport line that will go from Goyang to Hwaseong (for now, Ansan remains the Southern limit) venture further to the North-Northeast and connect to more New Towns.


 . Sillim Line inauguration (from Gwanaksan Station to Saetgang Station)

Thanks to this precious new vertical connected to Line 9 (Saetbang), Line 1 (Daebang), Line 7 (Boramae), Line 2 (Sillim), 'I live in Bongcheon-dong' will sound a lot more uplifting. But in parallel to this LRT,  Western Seoul needs more verticals (Gangnam-gu already getting it's fourth!), starting with Seobu Line...


 . Shinbundang Line Northwards extension from Gangnam Station to Sinsa Station:  

The article made its headline on the star extension because it's about real estate and money, and we're talking expensive real estate (Gangnam-daero), and expensive stations: Gangnam on Line 2, Sinnonhyeon on Line 9, Nonhyeon on Line 7, and Sinsa-dong on Line 3. No new stations, but hopefully fewer cars on the Hannam Bridge once Sinbundang's next profitable extension to the North will lead across the river and Yongsan, all the way to Yongsan Station.

*

Beyond railway and subway projects, Maeil Kyeongje also mentioned work on more sections of the capital region's Second Ring Expressway, which will definitely have some impact. But what the region needs is more public transportation, and a better dialog within Gyeonggi-do, beyond the usual Seoul-suburbs dialog.

It's always good to connect existing dots, and the Ansan-Bucheon-Goyang axis is very welcome, but no new major urban projects should be allowed without a direct connection to the network.

The problem is that Gyeonggi-do is poorly managed, and this has something to do with the way big cities compete with each other without a real regional authority. Only the State has the potential to force some collaboration, or at least more coopetition and less competition within Gyeonggi-do. The lack of political will and strategic vision results in the multiplication of projects cannibalizing each other, a suicidal rat race as the population ages and declines. Clearly, there are countless ways of spending less, better, and still generating much more value for everyone.

 
Seoul Village 2021
Welcome to our Korean Errlines! Follow Seoul Village on Facebook and Twitter, follow me on Instagram.
Download 'Seoul VillageS', the free ebook.
Bookmark and Share

* ""딱 역 3개인데, 폭발력 엄청나다"…판교 분당 부동산 난리난 이유" (Maeil Business Newspaper 20211226)
** see "Seoul subway to gain 89 km by 2025" (June 2015), "Seoul LRT Projects Update (Part 1/2)" and "Seoul LRT Projects Update (Part 2/2)" (August 2013, following "If you ain't broke, fix it: Seoul, Welfare and Railways Deficits" - July 2013). See also all subway related posts.

Monday, August 5, 2013

Seoul LRT Projects Update (Part 2/2)

This post completes my tryptic on the revised Seoul Metropolitan Rapid Transit Master Plan:
Before starting, one last glance at the map...



New LRT projects in Seoul
Seoul map with the projected LRT lines: the initial 7 in black, the updated list of 10 in red, 3 potential further projects in blue

... and at the updated list of LRT lines (7 + 3 + maybe 3, see previous post), with their projected daily traffic and length:

  • 7 lines in the initial list (in black on the above map):
    • Dongbuk Line (183,276 users, 13.3 km extended to 14.3)
    • Seobu Line (163,754 users, 15.7 km extended to 19.5) - see previous post
    • Sillim Line (119,743 users, 8.9 km extended to 10) - see previous post
    • Myeonmok Line (91,472 users, 9 km)
    • Mok-dong Line (89,587 users, 10.8 km)
    • Ui-Sincheol Extension (30,227 users, 3.5 km)
  • 3 new lines (in red on the above map):
    • Wirye-Sinsa Line (168,784 users, 14.8 km)
    • Subway Line 9 Extension (65,159 users, 3.8 km)
    • Wirye (33,081 users, 5 km)
  • for the 3 potential further projects (in blue on the above map), see previous post
And remember: this is only Seoul's wishlist, n projects at various stages of maturity, not even a final proposal. Don't expect everything to happen.



Mokdong Line: a new tentacle for Line 2
I'm starting with this project today to wrap up Southwest Seoul (after the Seobu, Sillim, Nangok lines and the Hongdae-Hwagok project). The Mokdong Line seems to be doubling the Subway Line 5 and the weird Sindorim-Kkachisan tentacle that grows from Subway Line 2. Actually, "Mokdong" is basically a new L-shaped Line 2 tentacle reaching from Dangsan to Sinwol, that crosses the first one without any connection, and fundamentally brings more traffic to Line 2 and to the growing Dangsan hub. On a more positive note, it alleviates the Sindorim and Yeongdeungpo-gu Office stations, and serves more directly central Mok-dong (between lines 5 and 9), plus the westernmost neighborhoods of Guro-gu, on the outer side of line 5.
  • Fundamentally, I don't like the idea of multiplying converging lines to a saturated axis, and to see all new line projects stop at Seoul borders, as if it were a wall. Particularly when, on the other side of this frontier, Bucheon's Ojeong-gu is solely crossed by the Gyeongin Expressway. I subscribe to the ambition of having most Seoul citizens living a maximum 10 mn walk away from subway stations, but Seoul is not an island, the city must improve its dialog with Gyeonggi-do, offer alternative to cars for commuters, consider maybe a second ring beyond line 2.... Always this deficit in vision and long term impacts, but also always these political bottlenecks at the local, regional, and national levels, which tend to multiply quick fixes, and to prevent larger scale and more sustainable projects from emerging.

  • The 12 projected stations (approximative list):
    • Dangsan Station (Subway Lines 2, 9) in Dangsan-dong, Yeongdeungpo-gu: a confirmation of the Dangsan-Yeouido-Noryangjin triple hub. The Mokdong Lines heads westwards.
    • Ewha Womans University Mokdong Hospital / Wolchon Middle School at the frontier of Yangpyeong-dong, Yeongdeungpo-gu, and Mok-dong, Yangcheon-gu: a high density "apateu" neighborhood on the other side of Anyangcheon
    • Mok-dong / SBS in Mok-dong, Yangcheon-gu: on the other side of the Gyeongin Expressway / Gukhoe-daero axis, by SBS center.
    • Omokgyo Station (Subway Line 5) in Mok-dong, Yangcheon-gu: still following the general direction of the Mokdongseo-ro / Mokdongdong-ro axis.
    • Yangcheon-gu Office in Sinjeong-dong, Yangcheon-gu: the station will be close to the actual office, a couple of blocks away from the Yangcheon-gu Office Station on the older "tentacle" of Line 2... I hope they are somehow connected, or that they'll come up with a different name, otherwise we're in for another Sinchon Station mess (the Line 2 - Gyeongui Line stations share the same name but are not connected). But according to the maps, the new tentacle crosses the old one without any connecting station. I know this is a light rail, low cost project, but considering the scarcity of subway lines in this city, I don't understand how one can come up with non-intersections. This is supposed to be a network, for gimchi's sake! Granted, it's already complicated to get a train in the direction of these weird tentacles...
    • Sintree Park in Sinjeong-dong, Yangcheon-gu: at the intersection of Jungang-ro and Sinjeong-ro. Line 2 passes here, and if this Sintree Station were on line 2, it would be exactly halfway between Yangcheon-gu Office and Sinjeongnegeori Stations.
    • Seobu Truck Terminal / Yangcheon high schools in Sinwol-dong, Yangcheon-gu: at the intersection between Nambusunhwan-ro (Nambu Ringway) and Sinjeong-ro, which continues across Waryongsan to Bucheon via the Gungdong Tunnel. At one stage, a short sub-tentacle was supposed to grow from here to Sinjeong District 3 and to a line depot, but the line follows Nambu Ringway northwards
    • Gangsin Middle School in Sinwol-dong, Yangcheon-gu: further on Nambusunhwan-ro 
    • Gangwol Elementary School in Sinwol-dong, Yangcheon-gu: at the intersection with Sinwol-ro. A lot of apartment blocks have been erected to the left of these last two stations, on the eastern slopes of Waryongsan, where the sub-tentacle would have landed.
    • Sinwol Interchange in Sinwol-dong, Yangcheon-gu: at the intersection between Nambu Ringway and Gyeongjin Expressway
    • Sinwol-dong Sageori in Sinwol-dong, Yangcheon-gu: at the intersection with Garogongwon-ro, which leads to Gogang-dong, Ojeong-gu, Bucheon
    • Sinwol in Sinwol-dong, Yangcheon-gu: at the intersection with Hwagok-ro, a significant road that leads to Gayang Bridge and the DMC to the East and (as Bongo-daero) to Jakjeon Station in Incheon


Ui-Banghak Line: not so simple

After yesterday's "3-Tailed Dragon" and this new tentacle, I'm taking a break with the simpler Ui-Banghak Line. No headache here, we're only prolonging the Ui-Sinseol Line, already well under way, to Banghak Station. The vertical between Bukhansan and Line 4 will then follow the parallel all the way to Subway Line 1.

  • No headhache? Note that Ui-Sinseol basically prolongs Line 2's eastern tentacle (Seongsu-Sinseol-dong), but that's not the same technology (LRT). Note also that this is not exactly an extension, but an outgrowth starting from the next to last station (Ui - Munigyo)... do we need more sub-tentacles? Typically the consequence of short term planning.

  • The 12 initial stations (reminder) - NB: tentative names, as usual here:
    • Sinseol-dong (Subway Lines 1, 2) in Dongdaemun-gu.
    • Bomun (Subway Line 6) in Seongbuk-gu
    • Sungshin Women's University (Subway Line 4) in Seongbuk-gu
    • Jeongneung (Jeongneung Samgeori) in Seongbuk-gu
    • Kookmin University - Seokyeong University (Jeongneung-dong) in Seongbuk-gu
    • Sinmia / Dongbuk Market in Gangbuk-gu
    • Samyang-dong Samgeori / Samyang Market in Gangbuk-gu
    • Hwagyesa / Sinsuyu in Gangbuk-gu
    • Ui Elementary School / Insu / Suyu in Gangbuk-gu
    • 4.19 Memorial Cemetery in Gangbuk-gu - close to Duksung Women's University in Dobong-gu
    • Ui / Munigyo Samgeori in Gangbuk-gu
    • Bukhansan / Ui-dong Resort in Gangbuk-gu. Theoretically the beginning of the line, and the line depot.
  • 2 new stations are planned for the new Ui-Banghak Line (4 stations overall):
    • Ui / Munigyo Samgeori (Ui-Sinseol Line) in Ui-dong, Gangbuk-gu: intersection of Samyang-ro and Haedeung-ro, which the new line takes eastwards, crossing Uicheon.
    • Banghak / Ssangmun / Seondeokgogyoipgu in Banghak-dong and Ssangmun-dong, Dobong-gu: at the intersection between Haedeung-ro and Sirubong-ro, in the middle of a massive new town. The line continues eastwards then takes Dobang-ro to the left.
    • Dobang in Banghak-dong, Dobong-gu: intersection between Dobang-ro and Sirubong-ro 15-gil
    • Banghak Station (Subway Line 1) in Dobong-dong, Dobong-gu:


Dongbuk Line: The Northeastern Light Rail Highway
One of the longest projects, and the one expecting the heaviest traffic, the Dongbuk Line improves coverage in Northeast Seoul and alleviates traffic from the saturated subway lines 1 and 4. Starting from Wangsimni Station, it initially stopped at Eunhaeng Sageori, but has been stretched to Sanggye Station.

  • Wangsimni confirms its role as a major hub west of the city center. Seoul takes care of its bed towns on the way, but doesn't extend the hand to the other side of Buramsan (well in the first place, Gyeonggi-do didn't plan any railway for its own New Towns there - a total nonsense for XXIst century urban planning).

  • Projected stations (tentative list):
    • Wangsimni Station (Subway Line 2, 5, Jungang Line) in Haengdang-dong, Seongdong-gu
    • Doseon Sageori in Doseon-dong, Majang-dong, and Hongik-dong, Seongdong-gu: intersection of Gosanja-ro and Majang-ro
    • Jegi-dong Station (Subway Line 1) in Yongdu-dong and Jegi-dong, Dongdaemun-gu. Note that we could have stopped on the way at Yongdu Station in the eastern tentacle of Line 2.
    • Korea University Station (Subway Line 6) in Jongam-dong, Seongbuk-gu, Cheongnyangni-dong, Dongdaemun-gu
    • Sungnye Elementary School in Jongam-dong, Seongbuk-gu: along Jongam-ro
    • Jongam in Jongam-dong, Seongbuk-gu
    • Miasamgeori Station (Subway Line 4) in Songcheon-dong and Songjung-dong, Gangbuk-gu. From then, the line follows the Wolgye-ro diagonal
    • Odong Park - Dream Forest in Songjung-dong, Gangbuk-gu
    • Dream Forest in Beon-dong, Gangbuk-gu, and Jangwi-dong, Seongbuk-gu
    • Wolgye Station (Subway Line 1) in Wolgye-dong, Nowon-gu: then, the line crosses Jungnangcheon, and Wolgye-ro becomes Hangeulbiseong-ro
    • Hagye Station (Subway Line 7) in Hagye-dong, Nowon-gu: and the new SeMA Nowon
    • Daejin High School in Hagye-dong, Nowon-gu: intersection Hangeulbiseong-ro / Nowon-ro
    • Eunhaeng Sageori in Junggye-dong, Nowon-gu: intersection Hangeulbiseong-ro / Junggye-ro (reminder: walk up that street to reach Baeksa Maeul). Where the line stopped in previous plans.
    • Sanggye Station (Subway Line 4)

Myeonmok Line: Eastern Eggs
Starting from Cheongnyangni, the Myeonmok Line covers a triangle between subway lines 1, 5, and 7 in Dongdaemun-gu, and almost reaches subway line 6 in Sinnae-dong, on the other side of the Jungang Line.

  • Private investors are interested by this line. Maybe because it can easily be prolonged, at a cheaper cost than line 6, to the Namyangju New Towns that will necessarily have to be connected some day. And speaking of connections, this line ignores the old Jungan Line as well as the Bonghwasan terminus of Line 6.

  • Projected stations (tentative list):
    • Cheongnyangni Station (Jungang Line, Subway Line 1) in Jeonnong-dong and Cheongnyangni-dong, Dongdaemun-gu.
    • University of Seoul in Jeonnong-dong, Dongdaemun-gu: the gate at Seoulsiripdae-ro and Jeonnong-ro
    • Jeonnong-dong in Jeonnong-dong, Dongdaemun-gu
    • Jangan-dog Sageori in Jangan-dong, Dongdaemun-gu: at the intersection of Dapsimni-ro and Jangan-ro, the line continues along the former, crosses Jungnangcheon
    • Myeonmok / Myeongmokcheon-ro in Myeonmok-dong, Jungnang-gu
    • Myeonmok Station (Subway Line 7) in Myeonmok-dong, Jungnang-gu
    • Dongwon Sageori / Gyeomjae Samgeori in Mangu-dong, Jungnang-gu
    • Yongmasan in Mangu-dong, Jungnang-gu: intersection Yongmasan-ro / Bongujae-ro, former Yongmaland amusement park
    • Mangu Sageori in Mangubon-dong, Mangu-bong, Jungnang-gu: intersection Yongmasan-ro / Mangu-ro - NB: we're passing between the Mangu and Yangwon stations of the Jungan Line, but no connection...
    • Jungnang-gu Office in Sinnae-dong, Jungnang-gu
    • Neungsan Samgeori in Sinnae-dong, Jungnang-gu
    • Sinnae in Sinnae-dong, Jungnang-gu


Wirye Sinsa Line & Wirye Line: New Town, Old Routes
At the frontier with Seongnam, Wirye New Town (Geoyeo-dong and Jangji-dong, Songpa-gu) gives its name to two projects:
  • The Wirye Line is an omnibus crossing the whole new town with 9 very close outdoor stations (it really looks like the Paris Tramway), and perfectly connected on both sides to existing subway lines (Macheon on line 5, Bokjeong on lines 3 and 8). Again, I'm not a fan of new town, but I would never allow any major project that doesn't from day one include a robust railway backbone, and this one has at least that right. Do we need 9 stations, and did we need this new town in the first place, that's another question.

  • The Wirye Sina Line does more than connect this new block to the grid: it goes all the way through to Sinsa, and I think this area has already seen many new lines in a recent past. Almost 15 km of essentially redundant lines, THAT's probably way too much.
    • The line would start from the lower third of the new town (7th station out of 9 on Wirye Line), follow line 8 around Jangji-Munjeong, until Garak Market. This first stretch is totally redundant and disproportionate. Remember, Wirye Line IS already connected to Line 8. Had this WSL started from the 5th station of the WL, and added a brand new station in the middle of non covered land (Munjeong-dong - Jangji-dong, halfway to Garak Market) it would still look too much.
    • After Garak Market, miracle: a new station in a less covered place (even then, Garak-1-dong is close to Songpa Station. WSL follows Tancheon and Tancheondong-ro, but I don't see any station on that long stretch... which line 9 is supposed to be covering soon anyway. So here again, almost total redundancy.
    • What next? WSL goes north, crosses lines 2 (Samseong Station), 9, and 7 (Cheongdam Station). Then it becomes a parallel to the same lines 2, 9, and 7, that will meet the soon to be extended Bundang Line, and meet Line 3.

Line 9 Extension
From the start, the Subway Line 9 Extension tells a lot about the failed Subway Line 5 fork. Forks and tentacles are not natural forms for railways. Line 9 will basically follow this vertical from Seoul Veterans Hospital (Dunchon-dong, Gangdong-gu) to Godeok Gangil District 1 (Godeok-dong, Gangdong-gu), but frankly prolonging subway line 8 would have done the job. It's just that while many neighborhoods have yet to see a railway line, some love to build three or four parallels just for fun. Okay. I'm getting tired here. And it's good to have a line (9) that crosses the whole city - and I hope, one day, beyond (I already wrote that I expected one of these lines to reach to Guri and Hanam. Someday).


*


Now if you don't mind, I'll drop the maps and take a nap.

Until the next batch of projects.


Seoul Village 2013
Welcome to our Korean Errlines! Follow Seoul Village on Facebook and Twitter
Bookmark and Share
Add this page to your favorites

* see "'서울 어디서나 도시철도 10분' - 철도 중심시대가 열립니다" (seoul.go.kr 20130725)

Sunday, August 4, 2013

Seoul LRT Projects Update (Part 1/2)

Here's the promised focus on the 10 Light Rail Transit lines proposed in the revised Seoul Metropolitan Rapid Transit Master Plan*... Or at least the first half (I told you it would take time!):
So. Again, overall, I strongly support the development of new railways across a metropolis that lags behind its global rivals in that most crucial field, and I'm happy to see major holes in the net fixed, but I want to be sure that the right priorities are set, particularly considering Seoul's limited financial resources, and the usual suspicions surrounding grand scale infrastructure projects popping up out of the blue a few months before mayoral elections.

And again, at the macro level, the master plan didn't lay out a clear strategic vision based on the existing situation and the challenges to come, which didn't help challenge the priorities, including at the micro level we're about to investigate now.

Are we missing something? And in case a trade-off were needed, which lines should be kept and which ones should be dumped? I wish I had all the answers and all the elements.

And remember: this is only Seoul's wishlist, n projects at various stages of maturity, not even a final proposal. Don't expect everything to happen.


The full (?) list of future LRT lines: from 7 to 10 (to 13?)


First, two maps (I told you, I love maps). I already showed you the first one, a "before-after" Seoul where each orange dot corresponds to a 10 min. walk around one railway station:


before and after the new lines - about this map, see previous post

The second map presents all the lines I'll list below:


New LRT projects in Seoul
Seoul map with the projected LRT lines: the initial 7 in black, the updated list of 10 in red, a 3 other projects in blue


Here's the revised list of ten LRT projects (starting with the initial list of 7, in black on the map / the last 3 - in italic, in red on the map - have just been added), with their projected daily traffic and length:
  • 7 lines in the initial list (in black on the above map):
    • Dongbuk Line (183,276 users - 13.3 km extended to 14.3)
    • Seobu Line (163,754 users - 15.7 km extended to 19.5)
    • Sillim Line (119,743 users - 8.9 km extended to 10)
    • Myeonmok Line (91,472 users - 9 km)
    • Mok-dong Line (89,587 users - 10.8 km)
    • Nangok Line (54,247 users - 4.1 km)
    • Ui-Sincheol Extension (30,227 users - 3.5 km)
  • 3 new lines (in red on the above map):
    • Wirye-Sinsa Line (168,784 users - 14.8 km)
    • Subway Line 9 Extension (65,159 users - 3.8 km)
    • Wirye (33,081 users - 5 km)

Seoul says 10,000 users are enough to make a line profitable (regardless of its configuration?). Note that for the moment, private investors have already shown interest in two lines: Seobu and Myeonmok.

3 other LRT projects (in blue on the above map) shall be considered 5 years from now, provided the conditions change favorably:


  • A further Subway Line 9 extension: from Godeok-Gangil District 1 to Gangil-dong, Gangdong-gu on the other side of the circular expressway 100, in the westernmost section of Seoul, right before Hanam. Reminder: back in 2010, Subway Line 5 was the one supposed to be prolonged to Hanam (see "Spectacular extensions of Seoul Subway Lines 4-5-6-7 ?")

  • A Hwagok-Hongdae Line that, judging by the sketches, would start from Hongik University Station, cross the DMC along Worldcupbuk-ro, take the Gayang Bridge across the Han river, and follow Hwagok-ro to Hwagok Station (Hawgok-dong, Gangseo-gu), joining subway lines 2, 6, 9, and 5 in the process. It would add a precious vertical link within Southwest Seoul (nothing outside of the Subway Line 2 ring), and bring the western halves of the city closer together (not to mention the DMC and Magok District). While Seoul is at it, why not consider a more ambitious second ring? Expensive, I know, but always keep an eye on the big picture


Now back to this list of 10. I'll start with the longest, the one that fills the biggest hole in Seoul's railway network, and the one I mentioned yesterday (see "Yonsei-ro the first street in Seoul to ban cars in its transportation mix"): Seobu Line. But I cannot do that without mentioning two shorter lines that are connected to it: Sillim and Nangok.


A 3-Tailed Dragon or the Seobu / University Line all the way?

  • If you see the proposed network, 3 new vertical LRT lines are connected to each other, like a 3-Tailed Dragon:
    • Seobu Line - The longest and most structural project: a vertical through Western Seoul (thus the name) that to the North fills the biggest hole in the network (around Eunpyeong-Seodaemun), and to the South cuts halfway between the too distant verticals of lines 2 and 4 (Dongjak-gu, Gwanak-gu). Between the two stretches, Seobu Line crosses Mapo-gu and doubles the horizontal line 9 through the saturated Yeouido hub. In previous plans, the line stopped halfway between Yeouido and Seoul National University Station.
    • Sillim Line - A vertical between Yeouido and Sillim-dong, but more to the west (closer to Line 2, at the Yeongdeungpo-gu / Dongjak-gu border), and reaching deeper to the south, to east-Sillim-dong (Sinwon-dong, Seowon-dong, Seorim-dong, Sillim-dong)
    •  Nangok Line - Around its middle (Boramae Park Station), where the Sillim Line becomes a diagonal, this vertical heads straigth to the south and west-Sillim-dong (Jowon-dong, Miseong-dong, Nangok-dong, Nanyang-dong)

  • Frankly, I don't believe in a "3-Tail LRT Dragon" scenario where all 3 lines (Seobu, Sillim, Nangok) get the nod. Among the possible scenarii:
    • If your priority is to reach SNU (that's a joke), you don't need a Sillim Line, and all you have to do is to add one "Inside SNU" station after Seoul National University Station via Gwanak-ro.
    • If you want to keep only one project, and if you consider that the Sillim Line vertical is less central than Seobu to fill the Line 2 - Line 4 gap, you can keep the Seobu Line all the way to Guam station, finish with the last 3 stations of the Sillim Line to serve Sillim-dong (plus SNU if you insist!) and, to draw a straighter line between both segments, to replace Seoul National Station with Bongcheon Station, and Euncheon Samgeori station with, say, a station at the intersection of Euncheon-ro and Yangmyeong-ro.
    • If you can only afford two lines, you can keep the modified Seobu Line I just described, and a combination of Sillim and Nangok (Yeouido-Boramae Park-Nanyang)


Seobu Line (approximative) list of stations
Seobu Line shall run from Saejeol Station in Eunpyeong-gu to Seoul National University Station in Gwanak-gu (in previous plans, it stopped at Jangseungbaegi Station):
  • Saejeol Station (Subway Line 6) in Sinsa-dong, Eunpyeong-gu: where Gajwa-ro, a major diagonal axis in Seodaemun, crosses Bulgwangcheon
  • Chungamgo Samgeori in Eungam-dong, Eunpyeong-gu (Baengnyeongsa: in front of Choongam High School, at a strategic fork betweeen Gajwa-ro and Baengnyeongsan-ro, which borders the recently erected Eungam New Town. After that, the line continues along Gajwa-ro and turns right at Geobukgol-ro, where it reaches the next station.
  • Myeongji University in Namgajwa-dong, Seodaemun-gu: the first major university on this line (Myeongjidae), with another new new town, Gajwa New Town. Another right angle but to the left this time: the line follows Jeungga-ro, crosses Hongjecheon to reach the center of Yeonhui-dong.
  • Yeonhui in Yeonhui-dong, Seodaemun-gu: at Yeonhui Samgeori (intersection between Jeungga-ro and Yeonhui-ro), near Yeonhui Elementary School. The line takes Yeonhui-ro to the right, then Seongsan-ro to the left.
  • Yonsei University in Sinchon-dong and Changcheon-dong, Seodaemun-gu: at the main gate of the university, in front of Yonsei-ro. About the impacts between this station and the next one (and my wish to see a connection with the Sinchon Station of the Gyeongui Line), read "Yonsei-ro the first street in Seoul to ban cars in its transportation mix".
  • Sinchon Station (Subway Line 2) in Changcheon-dong, Seodaemun-gu and Nogosan-dong, Mapo-gu. University-wise, that's very close to the entrance of Seogang University, and one station away from Hongdae and Ehwa. Note that we just passed 4 new stations since Line 6: if you look back to the "before-after" map, that fills the "white" triangle in Northwest Seoul.
  • Gwangheungchang Station (Subway Line 6) in Seogang-dong, Mapo-gu: we've been following Seogang-ro from Sinchon Rotary, and will continue straight across the Han river to Yeouido under the Seogang Bridge, where the avenue becomes Gukhoe-daero.
  • Seogang Bridge Southern End (Seogangdaegyonamdan Sageori) in Yeoui-dong, Yeongdeungpo-gu: at the intersection of Gukhoe-daero and Yeouiseo-ro. Instead of continuing straight and joining National Assembly Station, the Seobu Line takes Bokeum-gil to the left to draw a parallel to Subway Line 9, both lines cutting Yeouido in 3 almost equal slices.
  • MBC (Munhabangsong ap - Potential connection to Sillim Line?) in Yeoui-dong, Yeongdeungpo-gu: on the other side of the park, we're now on Gukjegeumyung-ro, at the intersection with Yeouinaru-ro, exactly halfway between Yeouinaru and Yeouido stations (Subway Line 5), less than 400 m on each direction on . It would be completely stupid not to make a direct connection with Yeouido Station, which is also on Subway Line 9: a simple corridor would do. But there is also a potential connection with the future Sillim Line (LRT), in case both are built. Note that 3 years ago, no connection was planned and that was quite a shock.
  • Yeouido St.Mary's Hospital in Yeoui-dong, Yeoui-gu: at the Catholic University of Korea hospital, where Gukjegeumyung-ro meets Yeouidong-ro.
  • Noryangjin Station (Subway Lines 1, 9) in Noryangjin-dong, Dongjak-gu: beyond the old fish market, a significant transportation hub, even if Seoul city has sidelined Noryangjin New Town. The line heads south, following Jangseungbaegi-ro, drawing a vertical line halfway between Subway Line 2 and Subway Line 4.
  • Jangseungbaegi Station (Subway Line 7) in Sangdo-dong, Dongjak-gu: typically, line 7 runs for 7 stations between line 2 and line 4 without meeting any other line, and Jangseungbaegi is the one in the middle.
    THIS IS WHERE SEOBU LINE STOPPED IN PREVIOUS PLANS.
  • Sinsangdo in Sangdo-dong, Dongjak-gu: that's the intersection of Jangseungbaegi-ro and Yangnyeong-ro, which the Seobu line will follow after that.
  • Guam in Bongcheon-dong, Gwanak-gu: more precisely at the intersection of Euncheon-dong, and Seonghyeon-dong, an area densely populated, on the other side of the Yangnyeong Tunnel. The line then takes Euncheon-ro to the left.
  • Euncheon Samgeori in Bongcheon-dong, Gwanak-gu: at the intersection of Euncheon-ro and Gwanak-ro (between Seonghyeon-dong, Jungang-dong, and Haengun-dong). The line takes Gwanak-ro to the right.
  • Seoul National University Station (Subway Line 2) in Bongcheon-dong, Gwanak-gu: on the stretch of 6 stations between Daerim and Sadang, Bongcheon Station would have been more central.


Sillim Line (approximative) list of stations
Sillim Line shall run from Yeouido to Nanhyang-dong:

  • MBC (Projected station - Seobu Line) in Yeoui-dong, Yeongdeungpo-gu: see above
  • Saetgang Station (Subway Line 9) in Yeoui-dong, Yeongdeungpo-gu: where the line used to start before someone realized it would be interesting to connect the line with Seobu. The line takes Yeouidaebang-ro, towards South-Southwest.
  • Daebang Station (Subway Line 1) in Daebang-dong, Dongjak-gu: at the intersection with Noryangjin-ro.
  • Seongnam Middle & High School in Singil-dong, Yeongdeungpo-gu and Daebang-dong, Dongjak-gu
  • Boramae Station (Subway Line 7) in Singil-dong, Yeongdeungpo-gu and Daebang-dong, Dongjak-gu
  • Boramae Park (LRT Nangok Line?) in Sindaebang-dong, Dongjak-gu: at the park and hospital. That's where Nangok Line is supposed to start. The Sillim Line heads to the East along Bongcheon-ro.
  • Danggok Sageori in Boramae-dong and Sillim-dong, Gwanak-gu: the intersection with Sillim-ro, which the line will take towards South
  • Sillim Station (Subway Line 2) in Sillim-dong, Gwanak-gu: the Sillim line will reach for the serpentine Dorimcheon
  • Dorimcheon in Seowon-dong and Seorim-dong, Gwanak-gu: near the second Sillim Bridge.
  • Sillim-ro near Sinseong Elementary School in Seorim-dong and Daehak-dong, Gwanak-gu: back to Sillim-ro, heading in the direction of SNU. On the other side of Dorimcheon starts Hoam-ro, along which Sillim New Town is under construction. Hoam-ro leads to Nangok-ro and Nanhyang-dong, where the Nangok Line ends. A potential Sillim Loop Line?
  • Seoul National University main gate in Sillim-dong, Gwanak-gu: main gate, at the intersection with Gwanak-ro.

Nangok Line (approximative) list of stations
Nangok Line shall run from Boramae Park to Nanyang-dong:

  • Boramae Park (LRT Sillim Line?) in Sindaebang-dong, Dongjak-gu: see above
  • Sindaebang Station (Subway Line 2) in Sindaebang-dong, Dongjak-gu and Sinsa-dong, Gwanak-gu: the line follows Nangok-ro
  • Nangok Sageori in Miseong-dong, Gwanak-gu: intersection with Munseong-ro
  • Nangok-dong in Nangok-dong, Gwanak-gu: the heart of a small valley of Gwanaksan.
  • Nanhyang-dong in Gwanak-gu: a cluster of apartments, and if you continue, Huam-ro, Sillim New Town (see above) 



Seoul Village 2013
Welcome to our Korean Errlines! Follow Seoul Village on Facebook and Twitter
Bookmark and Share
Add this page to your favorites

* see "'서울 어디서나 도시철도 10분' - 철도 중심시대가 열립니다" (seoul.go.kr 20130725)